Client: CNIM
Location: Cardiff (United Kingdom)
Client: IBERDROLA
Location: Algerie
Client: ALPIQ ENERGÍA ESPAÑA, S.A.U
Location: Tarragona (Spain)
Client: GENERAL ELECTRIC
Location: France
Client: GENERAL ELECTRIC
Location: France
Client: UTE ISOLUX-IECSA
Location: Santa Fé (Argentina)
Central de Ciclo combinado con una potencia total de 420 MW. Los trabajos consisten en la ejecución del montaje de una caldera HRSG, de flujo horizontal de 3 presiones con recalentado.
Client: IBERDROLA
Location: Germany
Client: DURO FELGUERA - OPEMASA
Location: Chile
Client: UTE BESOS 5 (TECNICAS REUNIDAS-DURO FELGUERA)
Location: Spain
Mechanical assembly of the UTE BESÓS - 850 MW combined cycle power plant, including: 1. (2) HRSG NEM boilers. 2) Smokestack. 3) Comprehensive piping.
Client: GLEFARAN
Location: Aranguren (Spain)
Client: CERANOR
Location: Spain
Control system of auxiliary services for Phase 1 and 2 of the CERANOR Don Juan cogeneration plants in Valencia, including connection with the PLC control systems of the groups to display all statuses/controls on screen. SIEMENS PLC-based system and SCADA INTOUCH system.
Client: HIDROELECTRICA DEL CANTABRICO
Location: Spain
Development of systems to perform monitoring and control of substations and transmission centres. The ABB scada system was used: MicroSCADA. Enables remote control with interlocks and connections with field units and control and protection units through various communication protocols. At the same time, microscada systems communicate with the office to ensure centralised control.
Client: ENDESA
Location: Spain
Updating throughout the years of the control systems of several hydropower plants and installing S7-400 programmable automation, SIEMENS SCADA WinCC and PROFIBUS networked remote control system. Plants covered by the works: EUME, PRADA, SAN SEBASTIAN, BARCENA, LAS ONDINAS, CORNATEL, QUEREÑO.
Client: COBRA PLANTAS INDUSTRIALES
Location: Chile
Assembly and start-up of electrical and instrumentation facilities and the design, supply and assembly of the lighting facility for Units I and II in Mejillones.
Client: DURO FELGUERA
Location: Chile
Turnkey construction project including engineering, supply, assembly and start-up of the 220kV substation.
Client: UTE BABCOCK WILCOX/ABB ALSTOM POWER
Location: Argentina
Assembly of electrical facilities and instrumentation.
Client: CONSORCIO DRAVICA
Location: Venezuela
Electrical system assembly, testing and start-up.
Client: TECNICAS REUNIDAS
Location: France
Electrical and instrumentation facilities for Gaz de France's Montoir combined cycle plant.
Client: INITEC/TECNICAS REUNIDAS
Location: Morocco
Supply and electrical and instrumentation assembly.
Client: RED ELECTRICA DE ESPAÑA (REE)
Location: Spain
Comprehensive engineering works for the construction of the Palos 400 kV substation, with exterior, ring-configured armoured modules with two bays, three combined-cycle group terminals and one 400/220 kV autotransformer. Included in the works performed was the design and calculation of earth-moving, civil works, structures, installations, control and protection and auxiliary services, for both the documentation required for legal processing and for the tender and subsequent construction of the substation.
Client: SIEMENS
Location: Spain
Comprehensive engineering works for the construction of the Jordana 400/220 kV substation. With a 400 kV compound, with exterior, ring-configured armoured modules with two bays and one 400/220 kV autotransformer. And a 220 kV compound, with interior, double busbar-configured armoured modules with seven bays, one autotransformer bay and coupling. Included in the works performed was the design and calculation of earth-moving, civil works, structures, installations, control and protection and auxiliary services, for both the documentation required for legal processing and for the tender and subsequent construction of the substation.
Client: RED ELECTRICA DE ESPAÑA (REE)
Location: Spain
Comprehensive engineering works for the construction of the Fuendetodos 400 kV substation, with exterior, ring-configured armoured modules, two bays and one autotransformer. Included in the works performed was the design and calculation of earth-moving, civil works, structures, installations, control and protection and auxiliary services, for both the documentation required for legal processing and for the tender and subsequent construction of the substation.
Client: ENDESA DISTRIBUCION ELECTRICA, S.A.
Location: Spain
Comprehensive engineering works for the construction of the Sant Adriá de Besós 220 kV substation, with interior, double busbar-configured armoured modules with five bays and four transformer bays, three group bays, two longitudinal coupling bays and one cross coupling. Included in the works performed was the design and calculation of earth-moving, civil works, structures, installations, control and protection and auxiliary services, for both the documentation required for legal processing and for the tender and subsequent construction of the substation.
Client: RED ELECTRICA DE ESPAÑA (REE)
Location: Spain
Comprehensive engineering works for the construction of the Puerto de la Cruz 400 kV substation, with conventional switchgear, an interrupter and half configuration made up of four lanes, including two reactor bays and one 400/220 kV autotransformer. Included in the works performed was the design and calculation of earth-moving, civil works, structures, installations, control and protection and auxiliary services, for both the documentation required for legal processing and for the tender and subsequent construction of the substation.
Client: RED ELECTRICA DE ESPAÑA (REE)
Location: Spain
Comprehensive engineering works for the construction of the Morvedre 400 kV substation, with exterior, double busbar ring-configured armoured modules with two bays, three combined-cycle group terminals and one 400/220 kV autotransformer and two bays to the converter station (connection cable with the Balearic Islands). Included in the works performed was the design and calculation of earth-moving, civil works, structures, installations, control and protection and auxiliary services, for both the documentation required for legal processing and for the tender and subsequent construction of the substation.
Client: RED ELECTRICA DE ESPAÑA (REE)
Location: Spain
Comprehensive engineering works, including documentation on the tender and subsequent construction of the facilities, for more than 50 facilities across Spain as part of REE's asset integration project. Including both the documentation on the structure and assembly of switchgear to be refurbished and the engineering to remodel the control, protection and remote control equipment. Partial technical assistance in critical phases.
Client: SIEMENS
Location: Spain
Comprehensive engineering works for the construction of the Puentes 400 kV substation, with interior, double busbar-configured technology made up by three group terminals and one coupling. Included in the works performed was the design and calculation of earth-moving, civil works, structures, installations, control and protection and auxiliary services, for both the documentation required for legal processing and for the tender and subsequent construction of the substation.
Client: RED ELECTRICA DE ESPAÑA (REE)
Location: Spain
Comprehensive engineering works for the construction of the Galapagar 220 kV substation, with conventional switchgear, double busbar configuration, two bays, one coupling bay and two transformer bays. Included in the works performed was the design and calculation of earth-moving, civil works, structures, installations, control and protection and auxiliary services, for both the documentation required for legal processing and for the tender and subsequent construction of the substation.
Client: ENEL UNION FENOSA RENOVABLES
Location: Spain
Diseño del esquema protectivo, Ajuste de selectividades, Pruebas de Protecciones, Pruebas Funcionales y Asistencia a las Puestas en Servicio de las subestaciones eléctricas de SAN GIL y PEñA II 30/132 kV.
Client: RED ELECTRICA DE ESPAÑA (REE)
Location: Casares, Málaga (Spain)
Client: ACCIONA ENERGIA
Location: Mulchén, Región Bio Bío (Chile)
Construcción de la línea eléctrica de 220 kV con una longitud de 33 km en dos tramos entre las subestaciones de los parques eólicos de San Gabriel y Tolpan y la subestación de Mulchen, en Renaico, Chile.
Client: GENERACIÓN SOLAR SPA
Location: Región de Antofagasta (Chile)
Ingeniería, suministro, construcción, montaje, pruebas y puesta en servicio y operación del Seccionamiento del circuito 2 de la LAT Cruceros - Laguna 220 kV y su conexión en la SE María Elena.
Client: COBRA INSTALACIONES Y SERVICIOS, S.A.
Location: Spain
Length of hanging: 21km LA-380 single circuit (GULL) plus OPGW optical fibre cable. Hoisting and reinforcement of Arce supports.
Client: EDEMSA
Location: Argentina
Construction and start-up of a 32 km-long 132kV overhead line.
Client: HIDROCANTABRICO DISTRIBUCION ELECTRICA, S.A.
Location: Spain
Maintenance of 50 to 400 kV substations in Asturias between 2005 and 2011.
Client: E.ON DISTRIBUCION, S.L
Location: Spain
Works and services at E.ON substations in Asturias and Lugo from 2010 to 2013.
Client: UFD
Location: España (Spain)
Los Trabajos en la red de media y baja tensión de UFD en Ferrol consisten en las siguientes tareas:
· Trabajos de montaje e instalación de acometidas.
· Nuevos suministros o ampliación de los existentes.
· Revisión de las instalaciones de enlace.
· Modificaciones de la red.
· Trabajos de desarrollo de la red de media y baja tensión.
· Trabajos de adecuación, sustitución o reforma y reglamentación de instalaciones.
· Puntos de telecontrol.
· Trabajos para el mantenimiento en las instalaciones de la red de media y baja tensión.
· La Operación Local, que abarca las actividades de:
o Maniobra de la red de media y baja tensión.
o Localizar, aislar averías y reponer el servicio de forma provisional en la red de media y baja tensión.
Atención de avisos por posibles averías en las instalaciones particulares de los clientes en baja tensión (denominados Suministros Únicos) y su reparación si el cliente acepta los precios y así lo solicita.
Client: EDP RENOVABLES ESPAÑA, S.L.U.
Location: España (Spain)
Las obras y servicios que se llevan a cabo en las Subestaciones ≥ 50kV de EDP HC Energía constan principalmente de las siguientes tareas:
Client: HIDROELECTRICA DEL CANTABRICO
Location: Spain
Expansion of the 400 kV compound of the Soto de Ribera (Ferreros) substation, including the engineering, supply, electrical and mechanical assembly and civil works of two 400 kV lanes called Calle 5 and Calle 6, including the supply to and installation of the necessary control, protection and communications housings. This 400 kV compound has an interrupter and a half configuration in a conventional weatherproof plant. In addition, the supply to, assembly of and civil works were carried out for the gateway of two 400 kV transmission lines to carry out the 400kV overhead-to-underground transition.
Client: ENGIE ENERGÍA S.A.
Location: Antofagasta (Chile)
Desarrollo de la ingeniería básica y detalle, suministro, construcción, montaje, pruebas y puesta en servicio de todos los trabajos asociados al nuevo patio de 220 kV de la Subestación Capricornio.
Client: RED ELECTRICA DE ESPAÑA (REE)
Location: Spain
"Turnkey" construction of the GIS Telledo 220 kV substation in accordance with REE standards, including: engineering, civil works, building construction, electrical and mechanical assembly, exterior switchgear supply and protection housing, auxiliary services, cabling and final testing up to commissioning for REE. The substation includes two bays, two transformer and coupling bays executed as armoured GIS manufactured by Siemens.
Client: CHILQUINTA ENERGIA
Location: Provincia Melipilla. Región Metropolitana (Chile)
Las obras contemplan el cambio de configuración del patio de 220 kV a interruptor y medio, instalación de un nuevo banco de autotransformadores monofásicos 220/110 kV 150 MVA con sus respectivos paños de conexión, en ambos niveles de tensión y la ampliación de la barra de 110 kV incluyendo la instalación de un paño seccionador en esta última barra.
Client: E.ON DISTRIBUCION, S.L
Location: Spain
Design of protective outline, adjustment of selectivity, protection testing, functional testing and start-up assistance for the SAN CIBRAO 20/132 kV electrical substation.
Client: RED ELECTRICA DE ESPAÑA (REE)
Location: Spain
Electromechanical installation and commissioning of 400 kV substation Salas (Asturias) for REE. The substation configuration is switch and Environment, with three streets, and the following positions: