Risk Assessment: Works. Electricity Lines

PREVENTIVE MEASURES

Rules for acting

  • Reconnecting the power supply:
    This manoeuvre is only to commence once work has finished, after all the workers who are not essential have left the work area and all the tools and equipment used have been removed.
    The steps to reconnect the power supply are: 1ª. Removal, should they exist, of additional protections and signs that indicate the limits of the work area.
    2ª. Removal, should it exist, of the short-circuit to ground.
    3ª. Unlocking and/or removal of the signs for cut-off devices.
    4ª. Closing of the circuits to re-establish the power supply.
    From the moment when one of the measures initially adopted to carry out work in the absence of voltage under safety conditions is suppressed, the part of the installation affected is to be considered live.
  • In work in the vicinity of live parts there must always be someone present with knowledge of electricity (Authorised/Qualified in keeping with Spanish Royal Decree 614/2001). In HV proximity work, there has to be a Preventive Resource figure present (minimum training: Basic Level in ORP). The client must request this type of work from the ISASTUR Group supervisor (not ask the worker directly to do it). Workers may only carry out this type of work with the approval of their supervisor.
  • Qualified/Authorised Workers (Spanish Royal Decree 614/01): work with an electrical hazard must be carried out and/or supervised by the qualified/authorised workers deemed proper, in accordance with the stipulations of Spanish Royal Decree 614/01 and ISASTUR procedures (see PC0712 and the corresponding Technical Instructions):
SUMMARY CHART FOR MINIMUM STAFF TRAINING/QUALIFICATIONS
NON-VOLTAGE WORK LIVE WORK MANOEUVRES, MEASUREMENTS, TESTS
AND CHECKS
PROXIMITY WORK

Suppressing and reconnecting the power supply

Carrying out of non-voltage work

Execution

Replacing fuses

Measurements, tests and checks

Local manoeuvres

Preparation Execution
Low voltage A W Q A A A A W
High voltage Q W Q+AW (overseen by a Foreman) Q
(remote)
Q or Q (aided by A) A Q A or W (overseen by A)

W= Any worker.
A = Authorised worker.
Q= Qualified worker.
Q+AW= Qualified and authorised in writing.

1. HV work with an electrical hazard cannot be carried out by workers from a Temporary Work Company (Spanish Royal Decree 216/1999).
2. The carrying out of the different activities considered is to be done in accordance with the stipulations of the present Spanish Royal Decree.
LIMIT DISTANCES FOR WORK AREAS
Vr DDAN-1 DDAN-2 DPROX-1 DPROX-2
≤1 50 50 70 300
3 62 52 112 300
6 62 53 112 300
10 65 55 115 300
15 66 57 116 300
20 72 60 122 300
30 82 66 132 300
45 98 73 148 300
66 120 85 170 300
110 160 100 210 500
132 180 110 330 300
220 260 160 410 300
380 390 250 540 700
Vr rated voltage of the installation in (kV).

DDAN-1 distance to the outer limit of the danger zone when there is a risk of overvoltage caused by lightning (cm).
DDAN-2 distance to the outer limit of the danger zone when there is no risk of overvoltage caused by lightning (cm).
DPROX-1 distance to the outer limit of the proximity zone when it is possible to precisely demarcate the work area and to establish controls that impede anyone from going beyond this limit during the carrying out of such work (cm).
DPROX-2 distance to the outer limit of the proximity zone when it is not possible to precisely demarcate the work area or to establish controls that impede anyone from going beyond this limit during the carrying out of such work (cm).
The distances for intermediate voltage values are to be calculated by linear interpolation.