Person responsible for the LVI
To authorise the carrying out of LVW on said installation, after a study has been carried out by him or by personnel in his charge.
Foreman
LVW Electrician
Number of persons
To carry out any kind of live work on LV via the “in Contact” method, at least two electricians with valid qualifications are needed. One of these is to assume the role of Foreman.
Prior study
A prior feasibility study is to be conducted in all jobs which, depending on the installation and on the characteristics of the task, will reveal the convenience of carrying out live work or not.
Checks
Material, personal and collective protections and insulating tools are to be checked, replacing those that present signs of wear in their insulation.
If any material that is essential for carrying out LVW should be missing or be deteriorated, the commencement of said work is to be postponed until such material has been replaced, or the work is to be done with the power disconnected, i.e. dead.
The use of non-approved tools is likewise forbidden, as is altering the original characteristics of the material.
Testing of gloves
Leakage testing of insulating gloves is mandatory every time they are used. Furthermore, all material must undergo periodic checks in the terms stipulated by the Firm.
Work clothes
Work clothes must not leave any part of the body uncovered. Workers are to take off all metal objects in Contact with their skin (watches, bracelets, rings, earrings, etc.).
Insulation of conducting elements
Earths and live parts are to be insulated as work advances. (ADVANCE PROTECTING AND RETREAT EXPOSING) Insulating gloves protect the point of entry of current into the body. Via appropriate insulation of the earths and live parts that come together in the work area, the electrician is insulated from any exit point, in addition to preventing unforeseen Contact.
Exposed points
Only one live point is to be left exposed, which will be the one being worked on. When, just before connecting, two points are exposed, the following conditions must be fulfilled:
Neutral
The neutral conductor is always be the first to be connected and the last to be disconnected. It is always to be considered as an active conductor.
Development of the Job
The appropriate Specific Work Procedures are to be applied in each case with the utmost attention and rigour. When faced with any doubt, work is not to be commenced or is to be interrupted.
Demarcation and Signposting
Suitably signposting and demarcating of the Work Area is mandatory.
Communication
To carry out LVW, it is essential to inform the corresponding Operations Centre of the commencement and completion of such work.